Skip to content
Serving Toronto and the Greater Toronto AreaCall (416) 398-8017
Call now
Home / In what order should you renovate?

In what order should you renovate?

Renovate from the inside of the walls outward: design and permits, demolition, structure, plumbing, electrical and heating, insulation and drywall, then flooring, cabinetry, trim and paint. Doing work in this order avoids tearing out finished surfaces to reach what is behind them.

All of our trades are licensed and insured

Mon to Fri: 8:00am to 6:00pm · Sat and Sun: Closed

In what order should you renovate?

The usual sequence for a house renovation

  1. Plan and permitsLayout, drawings, selections and any permits or engineering are settled before anything is removed. Decisions made here save the most money later.
  2. Demolition and protectionOld finishes come out, dust barriers go up and the areas you still live in are protected.
  3. StructureWalls, beams, framing repairs, windows and any addition work come first, because they change what everything else attaches to.
  4. Rough-in systemsPlumbing, electrical and heating run through open walls and floors, then are inspected where required.
  5. Insulation and drywallOnce rough-in is approved, walls are insulated, closed up, taped and sanded.
  6. FinishesFlooring, cabinets, counters, tile, trim, paint and fixtures go in last, followed by a walkthrough list.

Why the order matters

Every step depends on the one before it. Cutting a wall open for a new drain after the tile is installed means redoing the tile. Painting before flooring is installed means touching up. The pattern is simple: heavy and hidden work first, delicate and visible work last.

Material lead times shift the calendar, though. Windows, custom cabinets and special tile can take weeks, so we order them during the planning stage so they arrive when the crew is ready.

Room by room or the whole house

Some owners renovate one room at a time. That can suit a budget, but the order rules still apply across the whole house: if you plan to move a wall in two years, it is cheaper to open the floors and ceilings at the same time as other work. A single plan for every room, even if you build it in phases, keeps later work from undoing earlier work. Our whole house renovations page explains how we phase a larger project.

What to settle before demolition day

A short list, but each item shortens the schedule once crews arrive.

  • The final layout and where plumbing, lights and outlets go
  • Which walls are structural and whether engineering is needed
  • Permits and inspections for the work
  • Cabinet, window and fixture orders with their lead times
  • Where you will live and how dust and noise will be managed

Where bathrooms, kitchens and additions fit

Kitchens and bathrooms concentrate plumbing and electrical, so they often set the order for the rest of the house. Additions come before interior finishes because the structure must be closed in first. See our pages on kitchen renovations and home additions for how each fits into a larger plan.

Related questions

Can I live at home while renovating in this order?

Often yes for contained phases. Whole-house work may make a temporary move more comfortable, and we plan protected zones around your household.

Do permits come before design or after?

Design comes first, because drawings are needed for permit review. We tell you which parts of your plan need review before work is scheduled.

Should the kitchen or the bathroom go first?

It depends on which one you can least live without and where the plumbing stacks. We set the order once we see the plan.

Request a quote

Tell us what you need and we will get back to you. In a hurry? Calling is fastest.

Planning a renovation?

Call us for a free assessment of your house, then a written scope and price. All of our trades are licensed and insured.

Call now (416) 398-8017
Call now (416) 398-8017